China Best Prices Argon Gas Filling Machine for Double Glazed Glass

Customization: Available
Certification: CE, ISO
Condition: New

Product Description

i
Overview & Basic Information
Model NO.
AGM-02
Control System
Semi-Automatic
Glass Thickness
3 mm - 19 mm
Warranty
1 Year
Machine Type
Insulating Glass Production Line
Power
100W
Key Selling Points
Easy to Operate
Core Components
Motor, Pump, Engine
Usage
Filling Gas for Insulating Glass
Dimension(L*W*H)
770*450*770mm
Max Glass Size
2000X1500mm
Voltage
220V
Weight
60kg
Production Capacity
500000
Product Description

Main Features:

It can achieve filling work for 4 pieces of insulating glass one time. Automatically shows the glass filling condition.

Voltage220V
Max. number of insulating glass4Pcs
Volume of argon flow5-35L
Operating environment0~40ºC, no condensation, no water intrusion into the operation panel and electric control box.
Argon Gas Filling Machine
Packaging & Shipping
📦
Packaging & Delivery
Package Size
77.00cm * 45.00cm * 77.00cm
Package Gross Weight
35.000kg
Transport Package
Machine Packed in Wrap Film then Carton
🏢
Industry Profile
Factory Overview

Established in 2008. We are committed to producing and providing environmental energy-saving building materials and advanced intelligent efficiency machineries with expert technical support and service. Our main products scope includes:

  • I. Insulating Glass Sealing Materials
  • II. Adhesive Composition
  • III. Glass Deep Processing Equipments
  • IV. Fittings
  • VI. Hardware for Door and Window

Our team carries a modern spirit of high technology. The products are widely recognized and trusted by users and can meet continuously changing economic and social needs.

Certifications
Certification 1
Certification 2
?
Frequently Asked Questions
Q1: What is the MOQ for the insulating glass production line machine?
A: The minimum order quantity is 1 set.
Q2: How can I get a fast response to my inquiry?
A: You can send an email to our team or contact us directly via our provided communication channels.
Q3: What is the standard lead time for orders?
A: Samples usually require 5-7 days. Mass production typically takes between 15-30 days.
Q4: How are the goods shipped and what is the arrival time?
A: We generally ship via DHL, UPS, FedEx, or TNT, which takes 3-5 days. Airline and sea shipping are also available for large quantities.
Q5: What is the process for placing an order?
a: Share your specific requirements or needs with us.
b: We provide a quote based on your requirements.
c: Customer confirms the details and places a deposit for the formal order.
d: We arrange production and shipment.
Q6: Are testing reports provided for the machinery?
A: Yes, machinery test reports and video outgoing-inspections are provided for all units.

Related Products