Manual Secondary Sealant Silicon Spreading Machine for Insulating Glass Production

Customization: Available
Certification: CE
Control System: Pneumatic Switch, Pneumatic Control

Product Description

Product Description

ST05 sealant spreading machine

ST05 Sealant Spreading Machine

Model ST05 sealant spreading machine is made with the latest technologies, which applies to the sealing and spreading of secondary sealant. A/B pump adopts pneumatic air motor, which works sensibly and reliably.

Unique adjustable proportioning mechanism meets rigorous requirements for double constituent sealant.
Ensures smooth sealant flow and excellent coating effect.
Designed for high production efficiency and durability.

Technical Specifications

Parameter Details
ModelST05
Glass Thickness12-60 mm
TypeInsulating Glass Production Line
Mixing Ratio6:1 - 14:1
Sealant Output4-10 L/min
Max. Dispensing Pressure30 Mpa
Air Supply0.8-1.0 Mpa
Compressed Air0.6-0.8 MPa
Air Consumption0.8 M3/min
Diameter of A/B drum570mm / 280mm
Dimension1750×950×1980 mm
Weight510 Kg

Main Components

Components
Name Brand Origin
A/B air motorHasco/YLS. Korea
Safety valveHascoS. Korea
Pressure gaugeDeltaTaiwan
Sealing gunSelf-madeChina

Certifications & Exhibition

Certifications
Exhibition 1
Exhibition 2

Workshop & Production

Workshop 1
Workshop 2
Workshop 3
Insulating glass production line
Auto sealing robot

Packaging & Shipping

Packaging
Shipping

Professional Manufacturing

Company Banner

A professional manufacturer of insulating glass processing machinery, focusing on design, research, and development. The facility includes a 20,000 sqm workshop equipped with its own machining center, laser cutting, bending, and plastic spray systems. Machines offer high production efficiency and stable performance.

Auto spacer bending
Auto desiccant filling
Silicone spreading machine
Butyl extruder
Rotate table
Argon gas filling

Machining Center

Equipped with laser machines, cutting, bending, milling, and more to ensure precision manufacturing.

Machining center

Quality Testing Tools

Argon gas tester
Decibel Meter
Tachometer

Frequently Asked Questions

1. What is your soonest lead time? A: 60 days for a whole production line, and 30 days for a single machine. For special requirements, please check with our sales team.
2. How do you arrange the shipment? A: All machines fit in GP containers for sea freight savings. We use seaworthy packaging and professional container loading to ensure safe arrival.
3. What is the guarantee period? A: We provide a one-year guarantee (wearing parts are excluded). We offer life-long service and can send engineers for on-site assistance upon request.
4. How can we install the machines? A: Installation is included; however, customers cover the engineer's round-trip air tickets, local transportation, and accommodation. Installation typically finishes within 15 days.
5. How about the after-sales service? A: Spare parts are provided within 72 hours. Our experienced technical sales and service engineers are ready for on-site service and instruction.

Related Products